Lots of things going on today! The framing for the tank roof is up, and the roof comes next.
The Bobcat has been on site. The trench from the tank to the house has been filled in.
More important the site levelling is under way! He’s working off a datum point right up in the trees, and then moving north, levelling it out as he goes. This will the be height of the footings. Then the plinth, flooring and framing goes above it.
He’s also moved the cleared Boobialla out of the way (down the hill, to be a bonfire in the winter) so you can see what the view will be like from the west right round to the south east–it’s going to be great!
The beautiful heritage tea-trees are coming into flower.