The fill around the house has been pushed into the centre of the house area, to raise the level ready for the floor. The limestone blocks will be placed around the outside of the house to form the plinth. These were the blocks that were sourced from a garage being demolished and shipped onto the land and then onto the site (the earlier pictures). The fill will be smoothed off and then the slab will be poured! An actual floor! Lesley and Elle have been inspecting houses to look at different kinds of concrete finishes–the idea is to have that be the floor and then cover it with rugs. Festive!
Can you give an indication of directions? Is that a sea horizon in one of the photos?
I didn’t reply to this, sorry–that is pointing north, to a rise at the northern end of the property–no sea from the site, but there is if you climb the rise.