We have a slab!

Well, here is the poured slab! Not that you can see much of it, because it’s covered with plastic sheeting and sand to cure.  It all went well, Gary tells me–except that the truck was late so the sun was up and the concrete a bit stiffer from sitting in the truck, and it was a bit of a hustle to get it all out and bedded down.  So it will sit there for a couple of weeks before the surface polishing. In the meantime the framing is being made off site.

Who would have thought so much went into a big piece of concrete. . .but here it is!

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *